
A building that was used for cannabis extraction in Oak Creek, Colorado is now for sale.
The building’s electrical was upgraded to 3 phase with a total of 1200 amps available. Building also has floor drains with a grease trap. The building is a steel construction building. Building utilizes propane for heating. Building is also equipped with state certified video surveillance.
Building was licensed with the local town and the State as a cannabis manufacture. This building is eligible to be licenses as a manufacturing or growing location.